Roadmap

Treat this map as an architectural signpost, not a strict, closed path.

It shows the order in which I plan to open new possibilities for you across the entire ecosystem.

Holon Puzzle development is an organic process, so the time frames shown are my planned vector of action,
flexible and adapted to the realities of solo work.

Historical phase

Conceptual Phase and R&D
(Research & Development).

Intensive research, development of technological and psychological competencies. Shaping project architecture, system compositions and building foundations for a future integrated tool ecosystem.

2023 – 2025
11.2025

Soft launch
of the Element Guru platform.

Launch of a test version, validation of the first self-facilitation tools, design of digital product architecture and testing of early interface solutions on a live organism.

Operational Scaling and Infrastructure Build-out.

Systematisation of production processes (Content Pipeline), preparation of central tooling for applications and finalisation of a physical recording studio as command base.

01.2026 – 06.2026

Architecture becomes reality

Legalisation of business structures, completion of legal processes and official launch of Holon Puzzle mechanisms based on 100% independent capital.

Point Zero

End of simulation. The conceptual phase is behind me. The moment of full formalisation of action. Foundations are in place. Time to deliver the roadmap!

Future

Choose a holon and see what comes next.

New website architecture

Rebuilding the website as a dedicated solution to improve performance, security, and technological independence.

Q3 2026
Q4 2026

Content returns and live streams

Resuming regular publishing on social media and launching recurring thematic live streams.

Direction: Nexus

Intensive preparatory and implementation work on the Element: Nexus application.

2027

Local-first testing and cohesive design

Validating the architecture through internal testing and developing a shared visual system for the entire ecosystem.

Q3 2026
Q4 2026

Public releases and beta testing

Releasing the first public versions of the applications and launching official beta testing.

Ecosystem integration and development

Connecting the tools into one ecosystem and developing further features based on feedback.

2027

Legal and organizational foundations

Refining formal and legal matters and securing the long-term, stable development of the business.

Q3 2026
Q4 2026

Ecosystem (SSO) and project support

Implementing a shared sign-on system and convenient access to all websites and applications in the ecosystem. Enabling direct financial support for projects.

Automation and modern infrastructure

Implementing process automation tools to technically streamline future updates across the ecosystem.

2027

In-Project Productions

Composing and sound design for background needs of sister ecosystem projects.

Q3 2026
Q4 2026

Broader Music Distribution

Resumption of regular releases of original compositions on streaming platforms.

Further K.O.T. creative work

Further releases, craft and studio development — when the material and the setup allow it. No rigid quarters.

2027

New project on the way...